After Pennsic, I realized how many projects I have started and not anywhere close to finishing. So to save my sanity, and my space, I'm cleaning my house, organizing art supplies and FINISHING projects that I randomly have started. So far, I have 1)scroll for largess 2) red beaded snood 3)embroidered panels to make into silent auction pin pillows 3)green cotton garters 4)black fingerless gloves for Lady Rowan 5)beard hat for my friend Salt. If I finish these projects before the new year, I will be very happy. I think next year I'm going to put myself on a scheduled plan and that is all I can work on. Unfortunately I am very scattered brained, and I love shiny new ideas. When one pops in my head I end up starting and not finishing...which is NOT a good thing.
In other news, my landlord has decided to sell my apartment. While that means that we will eventually have new building owners, we will not have to find a new place to live until at least March. With that in mind, I'm going to have to work really hard to make sure these projects are finished so they can have new homes so I don't have to transport them to a new home if it comes to that. Still can't wait until Jehan and I can own our own place and I can allow the creative muses to flow....
until then,
An
Showing posts with label knitting. Show all posts
Showing posts with label knitting. Show all posts
Wednesday, September 4, 2013
Friday, June 28, 2013
Basic Knitting handout
This is a copy of the handout I use for the basic hand knitting I
use for teaching at SCA classes. Please use it, and remember to
cite you sources!
INTRODUCTION TO KNITTING
BASIC
ABBREVIATIONS FOR KNITTING:
·
BO-
bind off
·
Ch-chain;
may be seen as Ch1, Ch2, etc.
·
Circ-
circular
·
Co-
cast on
·
Dc-
double crochet
·
Dpn-
double-pointed needle(s)
·
K-knit
·
K2tog-
knit 2 (stitches) tog
·
M1R-
make one right slanting; with the tip of the left hand needle inserted from
back to front, lift the strand between the two needles onto the left hand
needle; knit through the front loop to increase one stitch
·
M1
or M1L- make 1 left slanting; with the tip of the left hand needle inserted
from front to back, lift the strand between the 2 needles onto the left hand
needle; knit the strand through the back loop to increase one stitch
·
P-
purl
·
P2tog-
purl 2 (stitches) together
·
Pm-
place marker
·
Rnd-
round
·
Rs-
right side
·
Ws-
wrong side
·
Ssk-
slip, slip, knit- slip the next 2 stitches to the right hand needle one at a
time as if to knit; return them back to left hand needle one at a timeto their
new orientation; knit them together through the back loops
·
St(s)-
stitches
·
Tog-
together
·
Yo-
yarn over; bring yarn forward (to the purl position), then place it in position
to work the next stitch. If the next stitch is to knit, bring yarn over the
needle and knit; of next stitch is to be purled, bring yarn over the needle and
then forward again to the purl position and purl.
Pot holder/arm warmer pattern
Cast on 44 stitches. Knit until desired length. Bind off.
With right side facing, sew side seam, beginning at cast on edge and ending 2
1/2 “ from bound-off edge, leaving a gap of approx 1 ½’ from thumbhole. Rejoin
yarn and sew seams to end. Weave in all ends
Works Cited:
26 Punk Knits
Hope you enjoy, and keep on Knitting!
~An
~An
Subscribe to:
Posts (Atom)
